Evaluation sign-in Discuss a Pilot FloLogIQ treats well selection, plant loading, pipeline routing and sales allocation as one daily optimization, then configures the model around each network's physics, data and economics. Our initial focus is unconventional gas.
Which wells run, how each plant is loaded, which routes carry the gas and where it is sold are linked decisions. FloLogIQ makes them together, as one daily production decision for the whole network.
FloLogIQ uses mixed-integer linear programming (MILP) to evaluate which wells to operate, how to allocate production through plants and pipelines, and where to sell it, while respecting the model's constraints.
Limits are provided by the customer and configured per network.
Modelled sales revenue less the costs included for the network and the expected shut-in cost of newly shutting in a producing well.
Each recommendation is compared with the current plan, shown as the improvement versus current plan.
How the economics are configured ↓Additional capabilities and integrations are scoped and developed around your network, data and operating requirements.
Links well selection and routing to network pressures, compression requirements and plant operating costs.
How hydraulics fits in ↓Machine-learning models trained on historical records to forecast well potential and plant capacity.
Operating and training data ↓Connections to your historians, databases and data platforms, agreed for each deployment.
Your data environment ↓Production streams, fees and commercial arrangements specific to your operation.
Customer-specific economics ↓The wells selected and the way production moves through the gathering network affect plant inlet pressures. In the planned hydraulic integration, these pressures will feed a separate calculation of compression energy and operating cost. Those costs and hydraulic limits will feed back into the optimization, helping identify an economically attractive, physically feasible operating plan.
Compression energy depends on inlet conditions, required discharge pressure, throughput and compressor performance. Plant operating-cost estimates can therefore change with the proposed production plan. Contractual processing fees remain separate inputs unless the applicable agreement links them to those costs. Feasibility is assessed within the configured model's assumptions and limits.
Current recommendations use supplied operating limits.
FloLogIQ is designed to connect to current operating data and historical records from plant and field historians. Current data will inform daily production recommendations, while historical data will support training machine-learning models, including neural networks, for production forecasting and hydraulic surrogate modelling. Data sources and integration requirements will be agreed for each deployment.
FloLogIQ's deployment and integration approach is tailored to your existing databases, historians and data platforms. Connections can be scoped and developed for environments such as Microsoft Azure, Amazon Web Services (AWS) and Databricks, based on your data, security and operating requirements.
Wells, gathering, plants, routes and markets are configured for each customer. Networks shown on this site are illustrative.
Each run is designed to keep its inputs, the recommendation, any overrides with reasons, and who approved the plan.
Recommendations only. FloLogIQ does not control wells, valves or equipment; field execution stays with your team and existing systems.
The economic model can be tailored to your production streams and commercial arrangements, including condensate revenue, liquid transport and handling, produced-water disposal and operator fees under joint-venture agreements. Customer-specific extensions can also account for idle well investment through agreed decision adjustments and evaluate potential effects on future development spending.
Estimated future restart-intervention cost, weighted by restart-failure probability and applied only when a producing well is recommended for shut-in.
It applies to an ON-to-OFF decision only, not to a well that stays OFF or returns to production.
A daily production plan is simple to describe and hard to get right. It takes optimization, field physics and operating practice in the same model.
Well selection, plant loading, routing and sales are solved as one problem, weighing network physics and economics together across wells, plants, pipelines and markets. Turning wells on or off makes it a mixed-integer problem, not a spreadsheet.
Which wells run and how gas is routed changes plant inlet pressures, and with them compression energy and cost. The planned hydraulic integration feeds those limits and costs back into the optimization instead of checking a finished plan.
Supplied operating limits, delivery commitments and locked wells are respected as constraints. When the team overrides a decision, the plan is re-optimized and reviewed again before anything changes in the field.
Founder Yashar Farajollahi, P.Eng., brings over two decades in oil and gas operations and 7+ years in enterprise data and AI. He is a co-inventor of a patented industrial optimization method (prior work, not a FloLogIQ patent).